Hatfield New Build
We completed the civil construction for a new SaskPower substation, delivering comprehensive site development and underground infrastructure to meet SaskPower specifications. From foundations and utility installations to access improvements and perimeter security, the project was completed with a focus on safety, quality, and long-term reliability.
Project Highlights
✔ Completed site preparation for a new 62 m × 83 m substation
✔ Managed installation of 40 cast-in-place piles and foundations
✔ Installed three new survey benchmarks
✔ Completed 11 underground duct runs with above- and below-grade grounding
✔ Installed a new culvert and constructed the substation access road
✔ Installed 189 m of 2.4 m chain-link security fencing with a 6.8 m access gate
✔ Completed bonding and grounding connections throughout the fence, posts, and gate system